IKG

 

Church of the Saviour Entrance Addition

Project Owner's name and address:

Church of the Saviour United Methodist

Cleveland Heights, Ohio

 

Completion:         Cost:

1998                        $215,000

 

Summary:

This addition provides a recognizable and useful main entry from the parking area, which has become the main daily access point. Previous access was unsheltered, though an area not designed as a major entry. The canopy provides a sheltered dropoff leading to a new vestibule and lobby. The vestibule glazing was enhaced by new window openings in the existing stair and corridor, and finishes were upgraded throughout the entry area. The project had to be built during the short summer break between Preschool sessions.